Monday, October 25, 2010

Dome Assembly(22/10/2010)

We were required to assemble the dome before the exhibition come. So on 22/10 after RUS101, we went back to hbp again for dome assembly. We were required to check our strut due to the exposure of the bamboo struts to the sun, it may dry up and shrink, so the connectors on it might loose cause the failure of the dome. So we checked our strut then. Sadly, the struts that our team did most of them are loose, so we were forced to redo our struts again.

Measure, mark, cut, fitting in the connector...all these works are repeated again...

I worked with my friends until late evening after I had completed doing a few struts..

No comments:

Post a Comment